AISI 1026 Cold Drawn Seamless Mechanical Tubing

AISI 1026 Cold Drawn Seamless Mechanical Tubing

Component I: Merchandise INTRODUCTION
one. Description: 
Mechanical tubing is a sort of steel tube broadly employed automotive market, engineering spot, as well as machinery elements. Normal specification of mechanical tubing is ASTM A519, masking carbon metal gardes and alloy steel grades. 

two. Commodity: AISI 1026 Chilly drawn seamless mechanical tubing

3. CZPT specification: ASTM A519, BS6323-four, CZPT specification.

four. Obtainable steel grade: Different carbon metal and alloy steel grades which includes but not limited to the subsequent:

ASTM A519: SAE1571,SAE1571,SAE1026,SAE1045,SAE1518,SAE1524,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,SAE8620
BS 6323-4: CFS3,CFS4,CFS5,CFS7,CFS8,CFS9,CFS10,CFS11
EN/DIN: ST35,ST45,ST52,E195,E235,E355,C35E,C45E,25CrMo4,34CrMo4,42CrMo4,

5. Size variety:

OD: upto 356mm
ID: upto 300mm
W.T: not limited

6. Manufacture strategy: Cold rolled, Cold drawn, CZPT chilly drawn

seven. Shipping Condition:

BK BKW BKS GBK NBK Q+T
+C +LC +SR +A +N
Cold rolled Cold drawn Stress relieved Annealed Normalized Quenched+Tempered

eight. End complete: simple finishes with sq. cuts,bevelled finishes.

9. CZPT export packing: in bundles tied with steel strips. Interior and exterior oil coating. External packing by PVC luggage and knit baggage.

ten. CZPTized packing or marking are CZPT on ask for.

MECHANICAL TUBING WITH THICK WALL: 

MECHANICAL TUBING WITH Quality 4140 Q+T:

MECHANICAL TUBING With no Heat Managing:

Component II: Usually Asked Inquiries
1. MOQ: 
three-5 tons/dimension for carbon metal grades, ten-twenty tons/dimension for alloy steel gardes.
2. Shipping Time: 20-thirty days for carbon metal mechanical tubings, 30-50 times for alloy metal mechanical tubings.
three. Warranty&Promise: Guarantee&ensure time period is 6 months since we produce the tubes, and we are not accountable for quality dilemma caused by mistaken unloading or storage soon after shipment. We welcome customer’s inspection just before cargo. 
four. Payment Approach: We accept payment approach like T/T, L/C, or D/P, but it relies upon on our investigation about customers. We have a solution to evaluate the credit score of buyers from all over the globe, and time and volume of D/P we can launch is decided by the evaluation. 
five. Top quality Handle: We acquire uncooked substance from secure suppliers who are leading metal mills, and we examine the raw material as for every the specifications. For the duration of our production method, there is inspection and top quality control in each phase.

Element III: Firm INTRODUCTION
We are a manufacturer of cold drawn, chilly rolled, and hydraulic cold drawn steel tubes with OD upto 356mm given that 2002. Masking an location of about 32000M2, we have 12 regular workshops with  2 hydraulic cold drawing benches, four chain chilly drawing benches, and two ERW mills. Our facilities addresses all the generation methods from pickling, chilly drawing,warmth treating,observed reducing, straightening,inspection,packing to more machining &turning, chilly drawing die fabrication, and products repairation&upkeep.

Manufacturing facility Appearance:

Uncooked Materials Stock:

Chilly DRAWING DIE WAREHOUSE:

HYDRAULIC Chilly DRAWING:

Warmth Managing FURNACE:

MULTI-ROLLER STRAIGHTENING:

STRAIGHTENING BY Press:

Saw Chopping:

 

AISI 1026 Cold Drawn Seamless Mechanical Tubing

Tags